CSIRO Publishing blank image blank image blank image blank imageBooksblank image blank image blank image blank imageJournalsblank image blank image blank image blank imageAbout Usblank image blank image blank image blank imageShopping Cartblank image blank image blank image You are here: Journals > Soil Research   
Soil Research
Journal Banner
  Soil, Land Care & Environmental Research
 
blank image Search
 
blank image blank image
blank image
 
  Advanced Search
   

Journal Home
About the Journal
Editorial Board
Contacts
For Advertisers
Content
Online Early
Current Issue
Just Accepted
All Issues
Special Issues
Sample Issue
For Authors
General Information
Notice to Authors
Submit Article
Open Access
For Referees
Referee Guidelines
Review Article
Annual Referee Index
For Subscribers
Subscription Prices
Customer Service
Print Publication Dates

blue arrow e-Alerts
blank image
Subscribe to our Email Alert or RSS feeds for the latest journal papers.

red arrow Connect with us
blank image
facebook   youtube

Now Online

Land Resources Surveys


 

Article << Previous     |     Next >>   Contents Vol 45(4)

Rehabilitation of field tunnel erosion using techniques developed for construction with dispersive soils

M. A. Hardie A D, W. E. Cotching B, P. R. Zund C

A Tasmanian Institute of Agricultural Research, University of Tasmania, PB 98, Hobart, Tas. 7006, Australia.
B Tasmanian Institute of Agricultural Research, University of Tasmania, PO Box 3523 Burnie, Tas. 7320, Australia.
C NRM South – Southern Tasmanian Natural Resource Management Committee, 13 St John Avenue, Newtown, Tas. 7008, Australia.
D Corresponding author. Email: Marcus.Hardie@utas.edu.au
 
PDF (995 KB) $25
 Export Citation
 Print
  


Abstract

Past repairs of field tunnel erosion using mechanical treatments (deep ripping, contour furrowing, contour ripping, etc.) and reestablishment of perennial vegetation have often failed, resulting in further tunnelling. Techniques to prevent ‘piping’ (tunnel erosion) in earth dams constructed using sodic clays have not been used in the repair of field tunnel erosion; however, these techniques have the potential to reduce recurrent failure. Installation of an optical fibre cable in a Grey Sodosol and Grey Dermosol at a site near Dunalley, Tasmania, in November 2001, resulted in the formation of a 380-m-long tunnel erosion system. Detailed site investigations and soil analysis in 2004 indicated that the tunnel erosion resulted from the consequences of inadequate compaction during the installation of the optical fibre cable, and secondary processes such as capture of surface and subsurface flow, dispersion of sodic clays, and translocation of dispersed clay platelets through the poorly compacted fill. Repair works consisted of excavating the entire length of the tunnel system, chemical amelioration with gypsum, compaction of repacked fill to reduce internal porosity, and installation of sand blocks to capture and remove water moving along the reinstalled cable. Inspections conducted 2 years after completion of the repair works indicated the site to be stable; however, it is acknowledged that this is too short an interval to adequately assess the long-term stability of repair works and techniques employed at the site. Due to the costs associated with the application of dam construction techniques, their use for the repair of field tunnel erosion is likely to only be justified where continued erosion poses a risk of damage to high value infrastructure.

Keywords: sodicity, dispersion, piping, optic fibre cable, gypsum.


   
Subscriber Login
Username:
Password:  

    
Legal & Privacy | Contact Us | Help

CSIRO

© CSIRO 1996-2013