CSIRO Publishing blank image blank image blank image blank imageBooksblank image blank image blank image blank imageJournalsblank image blank image blank image blank imageAbout Usblank image blank image blank image blank imageShopping Cartblank image blank image blank image You are here: Journals > Soil Research   
Soil Research
Journal Banner
  Soil, Land Care & Environmental Research
 
blank image Search
 
blank image blank image
blank image
 
  Advanced Search
   

Journal Home
About the Journal
Editorial Board
Contacts
For Advertisers
Content
Online Early
Current Issue
Just Accepted
All Issues
Special Issues
Sample Issue
For Authors
General Information
Notice to Authors
Submit Article
Open Access
For Referees
Referee Guidelines
Review an Article
Annual Referee Index
For Subscribers
Subscription Prices
Customer Service
Print Publication Dates

blue arrow e-Alerts
blank image
Subscribe to our Email Alert or RSS feeds for the latest journal papers.

red arrow Connect with us
blank image
facebook twitter youtube

Now Online

Land Resources Surveys


 

Article << Previous     |     Next >>   Contents Vol 27(3)

A review of the USDA SCS curve number method

WC Boughton

Australian Journal of Soil Research 27(3) 511 - 523
Published: 1989

Abstract

The origin and evolution of the USDA SCS curve number method for estimating runoff from small ungauged rural catchments is traced, and the characteristics of the method are examined. When the method is expressed as an infiltration equation, the infiltration rate becomes dependent on both total storm rainfall and rainfall intensity. When expressed as a spatially varied saturation overland flow model, the method implies that some part of any catchment has infinite surface storage capacity. The lack of physical reality in the formulation of the method is an inherent limitation to any further development. A major weakness is the sensitivity of estimated runoff to errors in the selection of the curve number. Changes of about 15-20% in the curve number doubles or halves the total estimated runoff. The results of some Australian studies where curve numbers have been calibrated against actual runoff data are collated.



Full text doi:10.1071/SR9890511

© CSIRO 1989

blank image
Subscriber Login
Username:
Password:  

 
PDF (547 KB) $25
 Export Citation
 Print
  
    
Legal & Privacy | Contact Us | Help

CSIRO

© CSIRO 1996-2014