ENVIRONMENTAL IMPACT OF SEISMIC OPERATIONS IN THE OTWAY BASIN, SOUTH AUSTRALIA

M. L. Williams, A. J. Boulton, M. Hyde, A. J. Kinnear and C. D. Cockshell

The APPEA Journal 34(1) 741 - 749
Published: 1994

Abstract

The Department of Mines and Energy, South Australia (DME) contracted Michael Williams and Associates Pty Ltd to audit the environmental management of seismic exploration operations in the South Australian Otway Basin. The audit was carried out in early 1992 and covered petroleum exploration operators and DME environmental management systems. An innovative field sampling technique was developed to compare the environmental impact of two different seismic line clearing techniques. Recovery of native vegetation as measured by vegetation structure was also quantified.

The audit found DME to have a dynamic and integrated environmental management system while company systems varied in standard. Wide consultation assisted the audit process.

As a result of clearing for agriculture, native vegetation covers only six per cent of the Otway Basin. With the strict limitations to broad-scale vegetation clearance since the mid-1980s and the cessation since 1991, the greatest environmental impact of seismic exploration is the clearance of native vegetation for access by seismic vehicles. Native vegetation structure and associated abiotic variables on seismic lines and adjacent control sites, were subject to a classification and ordination analysis which compared the impact of seismic lines constructed by bulldozer or Hydro-ax (industrial slasher). Post-seismic recovery rates of three different vegetation associations were also determined. This analytical technique permits the effects of seismic line clearance to be compared with the natural variability of specific vegetation associations within a region. In interpreting the results however, there is a confounding effect of line type and year as most of the more recent seismic lines were constructed using a Hydro-ax. Results indicate that Hydro-ax clearing affects vegetation structure less than bulldozing. Most Hydro-ax sites recovered within a few years whereas some sites, bulldozed as early as 1971, particularly tussock grasslands, have not yet recovered.

This study provides a significant break-through in the debate about the persistence of seismic impacts on native vegetation. As a rapid preliminary assessment, sampling vegetation structure rather than floristics, provides a cost-effective audit and monitoring technique which can be used by non-specialists in a range of petroleum exploration environments. Any significant structural differences may require more detailed analysis to determine if floristic composition also differed.